Skip to content (Press enter)

Convergent Battery Storage System – NSG Group Pilkington Glass Plant

S. & T. was selected as Convergent Energy +Power’s construction partner on a 5MW/10MWh battery energy storage system for NSG Group’s Pilkington plant in Collingwood, Ontario. This was the 8th project peformed successfully with Convergent. The scope of work included all heavy civil, concrete, ground grid, u/g electrical infrastructure, installation of all battery system components as well as the MV connection to the local distribution system.