Sarnia Battery Storage System – Arlanxeo
S. & T. was selected as Convergent Energy +Power’s construction partner on a 10MW/20MWh battery energy storage system for Arlanxeo Manufacturig Sarnia, Ontario. This is one of the largest behind-the-meter energy storage systems in Ontario. The scope of work included Ground grid, u/g electrical infrastructure, installation of all battery system components as well as the 28kV connection to the local distribution system as under ground boring project.