SSM PUC Substation #16
S. & T. Group was selected as the general contractor on this project for a local utility, PUC. The project scope included the demolition of sub 14 (retired) as well as the existing sub-16 complete with environmental management. The new build included: Site vegetation management, site civil preparation, install of grounding systems and bonding connections, install of underground duct bank, the construction of a new switchgear / transformer building, installation of new 35kV & 15kV GIS switchgear as well as all AC/DC auxiliary systems, protection systems, and communication & control equipment to integrate with SCADA. This also included testing and commissioning.
![](https://stgroup.ca/wp-content/uploads/2024/04/1232-ST-Website-Landscape_1080x720_0000s_0000s_0003_PUC-SS16-3.jpg)
![](https://stgroup.ca/wp-content/uploads/2024/04/1232-ST-Website-Landscape_1080x720_0000s_0000s_0004_PUC-SS16-2.jpg)
![](https://stgroup.ca/wp-content/uploads/2024/04/1232-ST-Website-Landscape_1080x720_0000s_0000s_0000_PUC-SS16-6.jpg)
![](https://stgroup.ca/wp-content/uploads/2024/04/1232-ST-Website-Landscape_1080x720_0000s_0000s_0001_PUC-SS16-5.jpg)